Back
San Vicente ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
DOCUMENTS
GALLERY
ASSET NAME
San Vicente
ASSET TYPE
Development
Development METALS & MINERALS
Lead, Silver, Zinc
DEPOSIT TYPE
Multiple underground, polymetallic.
SPECIFIC LOCATION
Trujillo, Peru
CURRENT ASSET STATUS
  • Permitting
REFERENCE OR DISTRICT NAME
Alto Chicama Mining District
NAME OF TREND
Cordillera Negra
OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
LIDA Resources 100
The San Vicente plant utilizes a standard flotation process to produce a silver-zinc concentrate and a silver-lead concentrate. Ore passes through a jaw crusher at the plant, and then is fed into a semi-autogenous mill/ ball mill grinding circuit. Following the concentration process in the flotation circuit, the concentrates are thickened and dewatered in filter presses prior to shipping.
0
0
ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Lead 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0
Zinc 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Lead 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0
Zinc 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
Capital Expenditures 0 0 0 0 0 0 0 0
Ore Tons Mined 0 0 0 0 0 0 0 0
Mill Feed - Ore Tons Processed 0 0 0 0 0 0 0 0
Lead (m lbs) Produced 0 0 0 0 0 0 0 0
Silver (m oz) Produced 0 0 0 0 0 0 0 0
Zinc (m lbs) Produced 0 0 0 0 0 0 0 0
Lead (m lbs) Sold 0 0 0 0 0 0 0 0
Silver (m oz) Sold 0 0 0 0 0 0 0 0
Zinc (m lbs) Sold 0 0 0 0 0 0 0 0
Lead Recovery (%) 0 0 0 0 0 0 0 0
Silver Recovery (%) 0 0 0 0 0 0 0 0
Zinc Recovery (%) 0 0 0 0 0 0 0 0
Cash Operating Cost 0 0 0 0 0 0 0 0
All - in Sustaining Costs 0 0 0 0 0 0 0 0
Strip Ratio – Waste:Ore 0 0 0 0 0 0 0 0
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRLead (lbs)Silver (oz)Zinc (lbs)
Date of Assessment
Nov 10, 2026
ACCESS TO PROPERTY
ROAD ACCESS
  • Year-round access
  • Dirt road
AIRPORT ACCESS
AIRPORT NAME
ESTIMATED TRAVEL TIME
SITE VISIT AVAILABILITY
Q3 - July- September 2026

Travel Description

 

Location:

In the District of Agallpampa, in the Province of Otuzco, at approximately
120 kilometres (2-3 Hrs) east of the coastal city of Trujillo, and 16 kms E-NE of the large Quiruvilca Mine.

Access:

To within 15 kms by paved road with all season dirt road thereafter.

 

FreeText

DOCUMENTS
San Vicente Document1 files
GALLERY
San Vicente Photos
San Vicente Photos